The original upper part from the Concept 1 was aluminum and had only a capstan. The Anchorlift has a drum/capstan option, and is all stainless. This is a great option, because a can use the drum for a send anchor, or to someone aloft.
Installation is straight forward, there are not too many installation options, unless you don't have an anchor roller already installed. The motor will go inside the anchor locker. I was thinking about installing it a little bit aft, so the motor will be inside the v- berth, and covered with a wood or fiberglass box, but it will get in the middle if I want to install a chainplate for a staysail. So, inside the locker it is!!
After aligning the windlass with the anchor roller, I noticed that it will have to be installed over the foreguy track (wich I don't have) channel, so I had to make a fiberglass "adaptor" to compensate for the curved deck
and the channel dept. Since the C38 anchor locker is not that deep, the chain and rode will probably need some help and been guided, so they won't jam at the windlass, but definitely, it will be less work that pulling a 45lbs CQR and 20' of 5/16
' chain!!!
The control box was located inside the V berth locker, so humidity wont as much, as if installed in the anchor locker.
Next job is to make somekind of box over the motor and a hole that leads to the v berth locker for ventilation. This way, it won't be exposed to the salty environment of the anchor locker.
